In June 2018, Kang lab will move to a new building, Engineering and Science Building. The lab and student office at over 1,200 sq ft will be situated on the top floor overlooking downtown San Marcos.
0 Replies to “The lab will move to new building in June 2018”
0 Replies to “The lab will move to new building in June 2018”